Lots 3 & 4 Covington Place
Lots 3 & 4 Covington Place
Shutters Installed
Espresso Stain
Red Oak floor sanded and ready for stainÂ
 Tile Completed
 Tile Completed
Masterbath
Masterbath
Interior PaintÂ
Interior PaintÂ
Fireplace Mantel
Fireplace Mantel
Brick finished
Brick finished
Garage side
Garage side
Rear view
Rear view
Grill detail
Grill detail
Ceiling & walls primed
Ceiling & walls primed
Primed walls
Primed walls
Brick started
Brick started
Grill roof painted
Grill roof painted
Drywall hungÂ
Drywall hungÂ
Kitchen/Family Room
Drywall hung
Drywall hung
Flex Room
Ready for brick
Ready for brick
Outdoor grill and screened porch
Outdoor grill and screened porch
Rough and Insulation Inspection Complete !
Sewer and water line installed
Sewer and water line installed
Street sewer connection
Street sewer connection
Front door installed
Front door installed
View from the 7th green
View from the 7th green
Final grade and lot 4 prep
Final grade and lot 4 prep
Windows Installed
Windows Installed
Exterior Painting Started
Roof and Siding Complete
House Framed
Finished Foundation
Slab Prep
Concrete Wall
Walls Forms
Footings
Grading
Clearing
Start